I learned from Chuanyue, a Guangdong resin tile manufacturer, that there is no complex process for the installation of resin tiles.

classify:Resin tile encyclopedia
The third main tile should be installed in reverse according to the local wind direction to install a wave crest (including the lap joint of the ridge tile) horizontally between the two tiles (including the lap of the ridge tile). The size of the 80mm longitudinal lap tile pitch lap joint should be fixed with self-tapping bolts at the contact position of the purlin.

Chuanyue Guangdong Co., Ltd.Guangdong resin tile factoryProfessional service providers, have reason to tell consumers or resin tile demand customers, resin tile installation projects need to pay attention to.

First, purlins can be made of square pipe steel (60*40*3mm) or C-section steel (100*50*20*3mm) or wood square (60*40mm), which need to be treated with anticorrosion.

Second, the distance between purlins should be determined according to the type of resin tiles (the distance between purlins of 880mm tiles is 660mm and 1050mm, and the spacing of purlins of 1050mm tiles is 750mm), which is arranged from bottom to top.

Third, the main tile should be installed in reverse according to the local wind direction. The size of a wave crest (including the lap of the ridge tile) between the two tiles is 80mm, and a tile pitch is longitudinally lapped. The contact part of the purlin must be fixed with self-tapping bolts.

Fourth, in the case of a roof with two slopes, the two slopes should be installed synchronously and symmetrically, so as to facilitate the coincidence of the waveforms during the installation of positive ridge tiles.

Fifth, after the installation of the inclined ridge tile at the end of the ridge tile, the lap joint between the positive ridge tile and the diagonal ridge tile should be leveled in order to form the installation of the three-way ridge tile.

Sixth, try to avoid coincident with the main tile when installing the right ridge tile, so as to reduce the installation gap.

Seventh, the fixing part is a special self-tapping bolt, first cushion the bolt gasket and then tighten it moderately with an electric wrench, and then cover the waterproof riser.

Resin tile news and information

I learned from Chuanyue, a Guangdong resin tile manufacturer, that there is no complex process for the installation of resin tiles.

classify:Resin tile encyclopedia

Chuanyue Guangdong Co., Ltd.Guangdong resin tile factoryProfessional service providers, have reason to tell consumers or resin tile demand customers, resin tile installation projects need to pay attention to.

First, purlins can be made of square pipe steel (60*40*3mm) or C-section steel (100*50*20*3mm) or wood square (60*40mm), which need to be treated with anticorrosion.

Second, the distance between purlins should be determined according to the type of resin tiles (the distance between purlins of 880mm tiles is 660mm and 1050mm, and the spacing of purlins of 1050mm tiles is 750mm), which is arranged from bottom to top.

Third, the main tile should be installed in reverse according to the local wind direction. The size of a wave crest (including the lap of the ridge tile) between the two tiles is 80mm, and a tile pitch is longitudinally lapped. The contact part of the purlin must be fixed with self-tapping bolts.

Fourth, in the case of a roof with two slopes, the two slopes should be installed synchronously and symmetrically, so as to facilitate the coincidence of the waveforms during the installation of positive ridge tiles.

Fifth, after the installation of the inclined ridge tile at the end of the ridge tile, the lap joint between the positive ridge tile and the diagonal ridge tile should be leveled in order to form the installation of the three-way ridge tile.

Sixth, try to avoid coincident with the main tile when installing the right ridge tile, so as to reduce the installation gap.

Seventh, the fixing part is a special self-tapping bolt, first cushion the bolt gasket and then tighten it moderately with an electric wrench, and then cover the waterproof riser.